Location: Halland, Sweden
Built and owned by: Alight AB
Electricity offtaker: H&M Group
Size: 6 hectares (equivalent to 8 football fields)
Installed capacity: 4 MWp
Annual production: 4 GWh (equivalent to the electricity consumption of 800 households)
Status: Commissioned in April 2025