Location: Nakkila municipality, Satakunta, south-east of Pori (Björneborg) in Finland
Built and owned by: Alight AB
Electricity offtaker: Discussion is going on with PPA offtakers.
Size: approximately 120 ha
Installed capacity: 90-100 MWp
Annual production: 90-100 GWh (equivalent to the electricity consumption of 20,000 households). A 30 MW BESS will be installed in the solar park.
Status: Under construction.
About the project: Sampo will be fully developed by end of year 2025. Construction start will likely be in 2027.