Location: Perniö , Salo in Finland (“Metsäkulma” project)
Built and owned by: Alight AB
Electricity offtaker: Discussion with PPA offtakers.
Size: 65 ha
Installed capacity: 45 MWp
Annual production: 50 GWh (equivalent to the electricity consumption of 10,000 households)
Status: The project is late stage development. Construction start can happen in the second half of 2027.